CMC Poland Sp. z o.o. | Development of project documentation as part of the investment task: "Renovation of the top wall of the Zestawów Hall in CMC Poland Sp. z o.o. in Zawiercie" |
Detail Engineering Projects in the construction and building field | 2018 |
CMC Poland Sp. z o.o. | Development of project documentation as part of the investment task: "Renovation of the top wall of the Nadstawek Hall in CMC Poland Sp. z o.o. in Zawiercie" |
Detail Engineering Projects in the construction and building field | 2018 |
ISD Huta Częstochowa Sp. z o.o. | Development of project documentation for the exhaust gas discharge from the KONEL electric arc furnace at ISD Huta Częstochowa Sp. z o.o. | Multi-branch Detail Engineering Projects | 2018 |
BP Koksoprojekt Sp. z o.o. |
Development of a concept for the biological ammonia water treatment plant at Plant Industrial Química del Nalón S.A. in Spain | Technical Concept | 2018 |
ISD Huta Częstochowa Sp. z o.o. | Development of a technical and cost concept for the exhaust gas discharge from the KONEL electric arc furnace for new production conditions at ISD Huta Częstochowa Sp. z o.o. |
Technical and Cost Concept | 2018 |
Stalprodukt S.A. | Development of design documentation softened water recovery plant (technology) coating line and thermal straightening of C3 at Stalprodukt S.A. | Conceptual design, Detail Engineering | 2017 |
CMC Poland Sp. z o.o. | Development of project documentation tower of emergency water tank in the area of dust removal facilities of the P33 Steelworks on the territory of CMC Poland Sp. z o.o. in Zawiercie |
Civil Engineering Design, Detail Engineering | 2017 |
CMC Poland Sp. z o.o. | Development of design documentation for crane beams of the billet shifter - COS II transfer at CMC Poland Sp. z o.o. in Zawiercie | Detail Engineering Projects in the construction and building field | 2017 |
Primetals Technologies Poland Sp. z o.o. | Developing the opportunity assessment additional load of the electrical room ceiling at the Wire Rolling Mill Department at ArcelorMittal Poland Sosnowiec |
Technical Opinion | 2017 |
COGNOR S.A. Oddział Ferrostal Łabędy w Gliwicach |
Development of a multi-branch Technical and Economic Concept for the installation of a new electric arc furnace, construction of a new 60 MVA transformer, a new reactive power station and a new dust removal unit with a capacity of approximately 1,200,000 Nm3 / h for the task of Reconstruction of Steelworks in Huta Ferrostal Łabędy in Gliwice | Multi-branch Technical and Economic Concept | 2017 |
CELSA Huta Ostrowiec Sp. z o.o. |
Development of project documentation devices for emergency loading of ingots on a transport table in the new Walcownia in CELSA "Huta Ostrowiec" Sp. z o.o. in Ostrowiec Świętokrzyski | Multi-branch Detail Engineering Projects | 2017 |
ENREM Połaniec |
Development of project documentation: "Correction of the steam pipeline system 3,0 MPa between the axes 1 and 2 of the Turbine generator Hall in Zakład Wytwarzania Kraków" | As-built documentation | 2017 |
COGNOR S.A. Oddział HSJ w Stalowej Woli | Development of economic and financial analysis defining the effectiveness of the investment task entitled: "A new line of long rolled products" at COGNOR S.A. HSJ branch in Stalowa Wola |
Economic and financial analysis | 2017 |
CMC Poland Sp. z o.o. | Development of project documentation for the investment project entitled "Construction of a new warehouse for used oils in the area of main warehouses at CMC Poland Sp. z o.o. in Zawiercie " |
Project Information Card, Complex Civil Engineering, Multidiscipline Detail Engineering Projects, Bill of quantities and Investment Cost Estimate | 2017 |
Grupa Kęty S.A. | Development of a technical analysis of the bearing capacity of the foundation under the NaOH reservoir at Grupa Kęty S.A. |
Technical analysis in the construction field |
2017 |
CMC Poland Sp. z o.o. | Development of the analysis of technical possibilities for the expansion of the Morgan Line on the premises of CMC Poland Sp. z o.o. in Zawiercie | Multi-branch technical analysis | 2017 |
CMC Poland Sp. z o.o. |
Developing documentation of repair and strengthening the foundations of the old COS II transit-ship cooling tower located at CMC Poland Sp. z o.o. in Zawiercie |
Detail Engineering Projects in the construction and building field | 2017 |
ArcelorMittal Service Group Sp. z o.o. | Developing an investor's cost estimate for installing an electric hoist at PH-5 AMP Dąbrowa Górnicza – Department DWG | Investment estimate | 2017 |
ArcelorMittal Service Group Sp. z o.o. | Development of the analysis of the possibility of cutting larger profiles on a shuttle shear at AMP Dąbrowa Górnicza – department DWS | Technical analysis in the technology and mechanical field | 2017 |
Przedsiębiorstwo Produkcyjno-Usługowe WAR-NO Sp. z o.o. | Connection of the old lightweight oil firing system to the new lightweight oil boiler system in EDF Polska SA | Detail Engineering Projects in the mechanical, energetics and electrical field | 2017 |
STACO Polska |
Designing of the new way of supplying the railcar for the transport of sheet metal in STACO Polska Sp. z o.o. in Niepołomice |
Detail Engineering Projects in the mechanical, construction and building and electrical field | 2017 |
CMC Poland Sp. z o.o. |
Elevation of steam extract channel from the secondary cooling chamber in CMC Poland Sp. z o.o. in Zawiercie | Detail Engineering Projects in the installation, construction and building field | 2017 |
CELSA Huta Ostrowiec Sp. z o.o. | Foundation of special drilling machine for deep holes in Hall No. 1 of Machining Department | Detail Engineering Projects in the construction and building field | 2017 |
Cognor S.A. Oddział HSJ w Stalowej Woli |
Increasing the size of D700 Rolling Mill production in HSJ in Stalowa Wola | Technical analysis |
2017 /2016 |
Huta "Kościuszko" S.A. w upadłości likwidacyjnej |
Modernization of the industrial water circuit of Rolling Mill in Chorzow | Multidisciplinary conceptual design with investment costs |
2017 /2016 |
ELEKTROBUDOWA S.A. | Construction of gas power unit fired blast furnace gas and natural gas with total electrical power of 55MW. Stage 2 - Construction of steam turbo set along with auxiliary economies at the Rolling Mill in Cracow | Participation in the preparation and submission of the offer | 2017 /2016 |
Huta Stali Jakościowych S.A. | Modernization of the saw area for hot cutting of rolled bars in rolling mill D700 in HSJ | Conceptual design with investment costs | 2016 |
TAMEH Polska Sp. z o.o. |
Reconstruction of the Tank and Pump Station of Low Points in TG hall | Detail Engineering Projects in the energetics field | 2016 |
Grupa Kęty S.A. |
Foundations for the bathtub for the sealing bath in the existing Anodic Hall in the Grupa Kety S.A. |
Detail Engineering Projects in the construction | 2016 |
ZGH "Bolesław" S.A. | „Construction of the New Cellhouse" in ZGH "Bolesław" S.A. in Bukowno | Development of material and financial schedules | 2016 |
STACO Polska Sp. z o.o. |
Modernization of the way of supplying the railcar for the transport of sheet metal in STACO Polska Spółka z o.o. in Niepołomice | Detail Engineering Projects in the mechanical, construction and building and electrical field | 2016 |
ArcelorMittal Poland S.A. |
Development of a Replacement Civil Engineering for the investment: Walking beam furnace construction no. 2 and Hall expansion at Hot Rolling Mill Plant in ArcelorMittal Poland S.A. Kraków |
Civil Engineering Project together with the obtaining decision on building permit | 2016 |
BIPROTECH Sp. z o.o. |
Development of documentation of demolition work and repairment of steel structures and foundations in the existing Hall in the Chemical Plant "RUDNIKI" SA | Detail Engineering Projects in the field of construction and building | 2016 |
TAMEH Polska |
The correction of the raw water pipeline and 3 MPa steam in the turbogenerators hall at the Department of Manufacturing Krakow |
Detail Engineering Projects in the energetics field |
2016 |
BIPROTECH Sp. z o.o. |
Reconstruction of the park tanks in the Department of raw material composition and packaging of oils at Lubricants Blending Plant Sp. z o.o. in Ostrowiec | Technical Analysis, Civil Engineering and Detail Engineering in the field of construction and building | 2016 |
Stalprodukt S.A. |
The construction of sheds for storage of dewatered sludge and infrastructure in Stalprodukt SA Bochnia |
Complex Civil Engineering, Multidiscipline Detail Engineering Projects, Comprehensive authorial supervision | 2016 |
DANIELI Centro Combustion SpA |
Documentation of natural gas pipeline in ArcelorMittal Poland SA in order to obtain the conformity assessment at the Technical Inspection |
Detail Engineering Project in the energetics field | 2016 |
Grupa Kęty S.A. |
Development of expert technical condition of the wastewater plant |
Civil Engineering Project together with the land development and road arrangement design | 2016 |
GSG Towers |
Development of a Replacement Civil Engineering for the investment "Construction of the LKM hall for Gdańsk Shipyard Group in w Gdańsk” |
Civil Engineering Project together with the land development and road arrangement design | 2016 |
Przedsiębiorstwo Produkcyjno-Handlowe KOMOBEX INEL Sp. z o.o |
Inventory of the existing situation and development of the documentation of hydraulic and greasing systems for Rolling Mill Department in AMP Sosnowiec |
Detail Engineering in the mechanical field |
2016 /2015 |
DANIELI Centro Combustion SpA |
Static and strength calculations natural gas pipeline DN250 from TOP 4 to the reduction station as part of „Walking beam furnace 450 t/h, Booster and Reduction Stations, WTP area in ArcelorMittal Poland Kraków" |
Engineering Services, strength calculations according to EN 13480 | 2016 /2015 |
Gmina Siepraw |
„Construction of wastewater system with pumping stations and connections to the buildings in Siepraw and Łyczanka – phase IV" |
Comprehensive authorial supervision | 2016 /2015 |
ArcelorMittal Poland S.A. |
Development of the concept of updating the organization of transport of raw materials and exported products and exported In ArcelorMittal Poland S.A. |
Conceptual design, together with statements of investment costs |
2016 /2015 |
Technoprojekt, a.s. Czech Republic |
Expansion of the finishing rails in ArcelorMittal Poland S.A. Dąbrowa Górnicza |
Detail Engineering in the field of technological and mechanical, Bill of quantities and Investment cost calculations |
2016 /2015 |
CMC Poland Sp. z o.o. |
Modernization of casting machines COS no. 2 in CMC Poland Sp. z o.o. |
Preparation of project documentation: Environmental Impact Assessment, obtaining the Environmental Decision Civil Engineering Design, obtaining decision on building permit, Multidiscipline Detail Engineering, As-built documentation and supervision services |
2016 /2015 |
BIPROSTAL S.A. |
Delivery, installation and commissioning of coke oven gas tank, emergency torch to burn coke oven gas and gas installations at AMP S.A. Kraków |
Preparation of project documentation: Environmental Impact Assessment, obtaining the Environmental Decision Civil Engineering Design, obtaining decision on building permit, Multidiscipline Detail Engineering, As-built documentation and supervision services |
2016 /2015 |
EDF Polska S.A. |
Water and wastewater pipelines and modernization of the PŚP07 pumping station at EDF Polska S.A. Rybnik |
Conceptual design, Civil Engineering Design, Detail Engineering and Investment cost calculations |
2016 /2015 |
ZGH " Bolesław" S.A. |
New segment installation of the Electrolyzers Hall at ZGH „Bolesław” S.A. |
Multidiscipline Conceptual design | 2015 |
DANIELI Centro Combustion SpA |
Execution of the proper drawing and technical characteristics necessary for the purpose of Building Permit Design for the project: „Walking beam furnace 450 t/h, Booster and Reduction Stations, WTP area in ArcelorMittal Poland Kraków" |
Consulting services, Civil Engineering Design | 2015 |
TELE-FONIKA Kable S.A. |
Return circulating water pumping station for rubber production line with the reconstruction of colliding installations at Works no. 3 |
Civil Engineering Design, obtaining decision on building permit, Detail Engineering | 2015 /2014 |
Huta Łabędy S.A. |
Technological foundations for pipe production line with finishing production hall and warehouse at Steel Plant |
Detail Engineering, Bill of quantities and Investment cost calculations |
2015 /2014 |
ArcelorMittal Poland S.A. |
Walking beam furnace construction no. 2 |
Preparation of project documentation: Environmental Impact Assessment, obtaining the Environmental Decision Civil Engineering Design, obtaining decision on building permit, Multidiscipline Detail Engineering, As-built documentation and supervision services |
2015 /2014 |
ELEKTROBUDOWA S.A. |
Reconstruction of the existing boiler plant into light fuel oil boiler in EDF Polska S.A. Kraków |
Civil Engineering Design, Multidiscipline Detail Engineering, As-built documentation and supervision services |
2015 /2014 |
EDF Polska S.A. |
Installation of flue gas denitrification (SNCR) for boilers K1, K3, K4, K5 i K6 at EDF Polska Rybnik |
Conceptual design, Civil Engineering Design, obtaining decision on building permit, Detail Engineering and supervision services |
2015 /2014 |
SPUTiH ALPINEX Sp. z o.o. |
Construction of Process Water Tank Tower, capacity 600m3 at Hucie Cynku Miasteczko |
Preparation of an application for land development conditions, Land Development Project, Civil Engineering Design, Detail Engineering and As-built documentation |
2015 /2014 |
ERBUD S.A. |
Optimization of the heating system at Dalkia Łódź S.A. - Modernization of the coal handling at EC3 Department |
Conceptual design, consulting services, Land Development Project, Multidiscipline Civil Engineering Design with a Railway, Multidiscipline Detail Engineering, As-built documentation |
2015 /2013 |
RAFAKO S.A. |
Design and installation of wet flue gas desulfurization IMOS according to the lime-gypsum technology at Heat and Power Plant EDF Polska Kraków |
Complex Civil Engineering Design along with obtaining a building permit, Replacement Civil Engineering design, Basic Engineering, Detail Engineering, As-built documentation |
2015 /2013 |
ArcelorMittal Poland S.A. |
Modernization of measuring and adjusting equipment in blast furnace gas Treatment no. 3 in ArcelorMittal Poland S.A. Kraków |
As-built documentation | 2014 |
Zakład Walcowniczy Profil S.A. |
Automatic control of pumps in Rolling Department Profil in Kraków |
Investment cost calculations in two variants | 2014 |
ABB Sp. z o.o |
Repair of coking water pretreatment at Arcelor Mittal Poland in the range of prefabrication distribution board nn R400P according to the recommendations ABB |
As-built documentation | 2014 |
Biuro Projektów „Koksoprojekt” Sp. z o.o. |
Construction of innovative water purification installation and gas from ammonia, hydrogen sulfide and hydrogen cyanide for CARBO-KOKS in Bytom |
Detail Engineering in the field of construction, Replacement Civil Engineering design | 2014 |
ArcelorMittal Poland S.A. |
Analysis of the conversion project LEC for Hot-dip galvanizing in ArcelorMittal Poland S.A. Kraków |
Variant feasibility study | 2014 |
Biuro Projektów „Koksoprojekt” Sp. z o.o. |
Construction of a coke gas-fired power unit with the expansion of benzol recovery system and accompanying infrastructure at Coke Plant Radlin |
Development of calculations, descriptive and drawing for Civil Engineering design |
2014 |
CMC Poland Sp. z o.o. |
Installation of a pole crane to allow disassembly of repair rolls of the roller table in the area of the furnace load over L/4 in CMC Poland |
Detail Engineering in the field of construction | 2014 |
FERROSTAL ŁABĘDY Sp. z o.o. |
Modernization of the steel structure supporting a water jacket furnace roof EAF at Ferrostal Łabędy |
Detail Engineering in the field of mechanical engineering | 2014 |
FERROSTAL ŁABĘDY Sp. z o.o. |
Changes in the foundation of raising drive actuators of an electric furnace ceiling |
Conceptual design, Detail Engineering | 2014 |
Huta Łabędy S.A. |
Architectural and construction concept of construction of a warehouse on the basis of a flyover along the crane track the structural analysis |
Conceptual design with bill of quantities and Investment cost calculations | 2014 |
Biuro Projektów „Koksoprojekt” Sp. z o.o. |
Expansion of the Benzol Recovery System in Coke Plant Przyjaźń S.A. |
Civil Engineering Design Detail Engineering, As-built documentation and supervision services |
2014 |
PPUH EKO-ENERGIA Sp. z o.o. |
Supply, installation and commissioning systems for NOx reduction - in Fertilizer Institute in Pulawy | Multidiscipline Detail Engineering with bill of quantities | 2014 |
Biuro Projektów „Koksoprojekt” Sp. z o.o. |
Reconstruction and development of By-Product Plant in ArcelorMittal Poland Coke Plant in Zdzieszowice |
Detail Engineering in the field of construction | 2014 |
CMC Poland |
Replacement of an electric furnace E2 for the Steel Electric Plant CMC Poland in Zawiercie |
Preparation of project documentation: Environmental Impact Assessment, Multidiscipline Civil Design, decision on building permit, Multidiscipline Detail Engineering |
2014 /2013 |
Biuro Projektów „Koksoprojekt” |
Expansion of Benzol Recivery System in Coking Plant Przyjaźń S.A. |
Multidiscipline Civil Engineering design, Detail Engineering, As-built documentation in the field of construction |
2014 /2013 |
Stalprodukt S.A. |
Technical documentation for modernization of the processing line B1 at Stalprodukt S.A. |
Detail Engineering in the field of technological, mechanical and energy | 2014 /2013 |
PKP Intercity S.A. |
Arrangement of waste water management system of units of BZ Kraków at. Półłanki 1 |
Drawing up and submission an application for a loan to WFOŚiGW in Krakow, reporting, attendance to inspections, inspector’s supervision |
2014 /2013 |
Zakład Energetyczny ZEN Sp. z o.o |
Adapting the existing gas reduction and mixing station SRM34 for the purpose of supply walking beam furnaces in mixed gases at ArcelorMittal Poland S.A. in Dąbrowa Górnicza |
Replacement Civil Engineering design, obtaining the building permit, changes to the Detail Engineering, As-built documentation | 2013 |
FERROSTAL ŁABĘDY Sp. z o.o. |
Development of the analysis and expertise of the technical condition of the hall structure scrap in Ferrostal Łabędy Sp. o.o. in Gliwice |
The analysis and expertise | 2013 |
PPUH EKO-ENERGIA |
Preparation of technical documentation to extend the roller and transfer table in the framework of "Long Track" in ArcelorMittal Poland SA |
Multidiscipline design documentation –Detail engineering, As-built documentation, software application, in a field of construction, energy and installation and electric |
2013 |
EDF Polska S.A. |
Preparation of technical documentation of accumulation area for crane in EDF Poland SA Krakow |
Multidiscipline design documentation – Civil design, decision on building permit, Detail engineering |
2013 |
ALCHEMIA S.A. |
Arrangement and reconstruction of Water and wastewater management for Steel Plant Batory in Chorzow |
Multidiscipline Basic Engineering | 2013 |
ArcelorMittal |
The vacuum installation for the transport of coal in the ArcelorMittal Poland Krakow Coke Plant | Detail Engineering in the field of technology and installation, electrical, automation and telecommunication | 2013 |
TELE-FONIKA Kable S.A |
Preparation of technical documentation for technological instalations for rubber production line in Kraków |
Detail Engineering in a field of construction, energy and installation and electric | 2013 |
Biuro Projektów „Koksoprojekt” |
Development and reconstruction of the bunker building, carbon tower, carbon dumping station, coal stockpile site, vacuuming instalation and service channels for coke battery along with construction and reconstruction of the road system and infrastructure in the Coke Plant Jadwiga in Zabrze |
Preparation of project documentation: Environmental Impact Assessment, Multidiscipline Civil Design, decision on building permit, Multidiscipline Detail Engineering |
2013 |
ArcelorMittal Poland S.A. Unit in Zdzieszowice |
Renovation of the excess and recirculated sludge pumping station - unit PRO 5 |
Multidiscipline design documentation – Detail engineering |
2013 |
Biuro Projektów „Koksoprojekt” |
Construction of innovative plant to purify water and gas of ammonia, hydrogen sulfide and hydrogen cyanide, BTX removal plant ,coal water treatment plant, building s of gas desulfurization plant’s control room’s, PGO pump station, road system and technical infrastructure” in CARBO-KOKS Bytom |
Design documentation: materials to apply for WZ, Civil Engineering design: architectural-building, structural, roads, installation disciplines and Site Management Plan |
2013 |
ArcelorMittal Poland S.A. Unit in Dąbrowa Górnicza |
Technical documentation of drive mechanism to the existing rail car in Heavy Section Rolling Mill at ArcelorMittal Poland S.A. Unit in Dąbrowa Górnicza |
As-built documentation |
2013 |
ZARMEN Sp. z o.o. |
Biological Waste Water Treatment Plant with Oxygen Gasification Unit for Coke Plant Unit of ArcelorMittal Poland S.A. Krakow Division |
As-built documentation |
2013 |
ArcelorMittal Poland S.A. Unit in Dąbrowa Górnicza |
Overhaul of pump station of recirculated and excess sludge (ob. POR 5) at ArcelorMittal Poland Unit in Zdzieszowice |
Multidiscipline design documentation – Detail engineering |
2013 |
Biuro Projektów „Koksoprojekt” |
Extension of the installation of pouring in coking plants Jadwiga, Dębieńsko and Radlin |
Multidiscipline Detail Engineering |
2013 |
Stalprodukt S.A. |
Power installations of two humidification stations of technological line B2 at Department of Transformer Sheets Stalprodukt S.A. in Bochnia |
Basic Engineering, Multidiscipline Detail Engineering and supervision services |
2013 |
PPUH EKO-ENERGIA |
Modernization and installation of remote control system for Hydro-Technical Facilities Rzozów in Power Plant Skawina |
Complete documentation – Detail engineering and As-built documentation |
2013 |
"PKP CARGO WAGON-KRAKÓW" Sp. z o.o. |
Documentation to modernize of wagons shifter type WEN3, 19 kW, constructed in 1966, at rail no. 604 of PKP CARGO WAGON-KRAKÓW Sp. z o.o. |
Complete documentation – Detail engineering |
2013 |
ArcelorMittal |
Technical-economical analysis of optimization of compressed air production at ArcelorMittal Poland S.A. Unit in Krakow |
Technical and economic analysis |
2013 |
PKP Intercity S.A. |
Arrangement of waste water management system of units of BZ Kraków at. Półłanki 1 |
Drawing up and submission an application for a loan to WFOŚiGW in Krakow, reporting, attendance to inspections, inspector’s supervision |
2012 |
Biuro Projektów „Koksoprojekt” |
The modernization of coke oven battery no. 4 together with appurtenant technology nodes and auxiliary facilities in Koksownia Przyjaźń |
Development of calculations, descriptive and drawing for Civil Engineering design, Detail Engineering |
2012 |
AWBUD S.A. |
Construction of the sports and entertainment Tauron Arena Krakow |
Verification of the Detail in the field of construction |
2012 |
Stalprodukt S.A. |
Construction of waste water treatment units at Power Division of Stalprodukt S.A. in Bochnia |
Complete documentation – Civil Engineering design and Detail Engineering |
2012 |
PPUH EKO-ENERGIA |
Cooling chamber at AMP Steelmaking shop in Dąbrowa Górnicza |
Complete documentation – Detail Engineering |
2012 |
PPUH EKO-ENERGIA Sp. z o.o. |
Modernization of Machine COS no. 2 at ArcelorMittal Poland S.A. Dąbrowa Górnicza |
Multidiscipline design documentation - Detail engineering and as-built |
2012 |
Biuro Projektów „Koksoprojekt” |
Modernization of electrical power management system at Przyjaźń Sp. z o.o. Coke Plant |
Drawings and descriptive part to Civil Engineering Design |
2012 |
ArcelorMittal Poland S.A. Unit in Dąbrowa Górnicza |
Multidiscipline Technical-economic Analysis of construction of a coke oven gas tank and gas torch for ZE-K3 Plant at ArcelorMittal Poland S.A. Unit in Kraków |
Multidiscipline technical-economic Analysis |
2012 |
AWBUD S.A. |
Extension of Bay of Rolling Mill P52 in CMC Zawiercie S.A. |
Multidiscipline design documentation with Engineering supervision services |
2012 |
PPUH EKO-ENERGIA |
Installing of a turbo generator with power output ca. 50 MW in Heat and Power Plant EC Nowa Sp. z o.o. |
Documentation of technological, power engineering, electrical and automation documentation to Civil Engineering Design |
2012 |
ZARMEN Sp. z o.o. |
Consulting services in the framework of carrying-out civil works to Project.: „Biological Waste Water Treatment Plant for Coke Plant of ArcelorMittal Poland S.A. Unit in Kraków” |
Consulting and assistance services jointly with development of design solutions to Detail Engineering design documentation |
2012 |
Celsa |
Multidiscipline documentation: "Ventilation of cable ducts in the area of Furnace no. 6" at Celsa Ostrowiec Steelowrks Sp. z o.o. |
Complete documentation – Detail Engineering |
2012 |
Stalprodukt S.A. |
Utilities and water supply to Standardization and Picking line at rolling mill of transformer plates at Stalprodukt S.A. in Bochnia |
Detail engineering of network and installations of utilities and reinforcement of structure of the trestle bridge posts |
2012 |
ArcelorMittal |
Repair of demineralized water system in the area of Steel plant at ArcelorMittal Poland S.A. O/Kraków |
Complete documentation – Detail Engineering designs |
2012 |
Biuro Projektów „Koksoprojekt” |
Modernization of Coal Preparation Division at „Jadwiga” Coke Plant, Zabrze-Biskupice |
Complete documentation – Environment Protection Report, Documentation to WZ, Civil engineering Design, As-built documentation |
2011 |
Stocznia Gdańsk S.A. GSG Tower Sp. z o.o. |
LKM Bay with corrosion protection technology and technological equipment in the Shipyard “Stocznia Gdańsk S.A”, Gdańsk |
General Designer and General Contractor – Design, manufacturing, delivery, erection and commissioning |
2011 |
BIPROSTAL S.A. |
"Reconstruction and superstructure of the buildings the company's own Biprostal SA street Królewska 57 in Krakow" along with a system of energy management in buildings |
General Designer and the Contractor reconstruction and superstructure Building Low - Comprehensive, multi-branch technical documentation - Civil Engineering Design, Detail Engineering, as-built documentation - Building 8-storey building with a cubature of 31.000m3, ~8.000m2 usable area |
2011 |
Biuro Projektów „Koksoprojekt” |
Modernization of By-products Division at ArcelorMittal Poland S.A. Division in Zdzieszowice |
Complete documentation – Detail Engineering in Civil Engineering discipline |
2011 |
BIPROMET S.A. in Katowice |
The industrial 5-bays hall 55m high in KGHM Polska Miedź S.A. Unit in Głogów |
Building Engineering and Detail Engineering civil/structure documentation of the hall for two furnaces |
2011 |
ZGH „Bolesław” S.A. in Bukowno |
Build of the New Zinc Hall in ZGH “Bolesław” S.A. in Bukowno |
Complex documentation – Building Permit Design and Detail Engineering
|
2011 |
ArcelorMittal Warszawa Sp. z o.o. in Warszawa
|
The installation SBQ in the New Rolling-mill |
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
ArcelorMittal PoladnS.A. Unit in Dąbrowa Górnicza |
Adjusting existing reduction-mixing station SRM 34 for the needs of supplying walking furnace with mixing gas
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
ArcelorMittal Poland S.A. Unit in Kraków |
Chemical Cleaning Water Plant no 1 – extension of – enlargement of production capability water demineralization station. Replacing of soft chemical water with demineralization water
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
ArcelorMittal Poland S.A. Unit in Kraków |
Biological Treatment Water Plant no 1
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
ArcelorMittal Poland S.A. Unit in Kraków |
Industrial Waste Water Treatment for Coke Plant for ArcelorMittal Poland S.A. Unit in Kraków
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
Celsa Huta Ostrowiec Sp. .z o.o. in Ostrowiec Świętokrzyski |
New Water Treatment Plant for two Continuous Casting Lines In Electric Steel Plant with reconstruction existing auxiliary facilities and demolition part o existing facilities
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
Celsa Huta Ostrowiec Sp. .z o.o. in Ostrowiec Świętokrzyski |
Reconstruction existing water economy of Continous Casting Line In Electric Steel Plant with reconstruction existing auxiliary facilities and demolition part o existing facilities
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
Biuro Projektów „Koksoprojekt” |
„Erection of cleaning coke gas from hydrosulphur, ammonia with ecologic and economic prove their utilization” in Koksownia Victoria S.A. in Wałbrzych
|
Detail Engineering in civil branch |
2009 |
Zakłady Koksownicze „Zdzieszowice” |
Modernization of loading system of coke in sorting plant no 3
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
Celsa Huta Ostrowiec Sp. .z o.o. |
New Continous Casting Line no 1 |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
Celsa Huta Ostrowiec Sp. .z o.o. |
Extension of COS no 1 |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
CMC Zawiercie S.A. |
Extension of Rod Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
Zakłady Koksownicze „Zdzieszowice” |
Installation of rail scales for weighing in motion
|
Complex documentation – Building Permit Design and Detail Engineering |
2008 |
CMC Zawiercie S.A. |
New Rod Mill – MORGAN |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
Huta Batory Sp. z o.o. in Chorzów |
Steel Plant – Reconstruction of electric furnace |
General Management – Reconstruction of electric furnace Q=30 Mg with installation next to furnace and damaged elements of steel constructions and foundations
|
2007 /2008 |
Celsa Huta Ostrowiec Sp. .z o.o. |
Execution of new buildings for new Rolling Mill no 2 |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
CMC Zawiercie S.A. |
Build-on new store buildings of products ready to dispatch |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
ISD Huta Częstochowa sp. z o.o.
|
Thick Plate Mill – cooling ttype “MULPIC” |
Complex documentation – Building Permit Design and Detail Engineering |
2007 |
Celsa Huta Ostrowiec Sp. .z o.o. |
Build – on existing Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
Stalprodukt S.A. |
MgO coating lines technology for transformers stripsTransformer Plate Mill
|
Technical documentation of installation of lines B3; B4; C3” in the bay K-L
|
2007 |
Celsa Huta Ostrowiec Sp. .z o.o. |
Revamping of existing Rods and Shapes Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
ARCELOR S.A. |
Rolling Mill
|
Multidiscipline Building Permit Design |
2006 |
CELSA – STEEL PLANT OSTROWIEC |
- Walking-beam cooler receiving ingots 160x160x15 500
|
Technical analysis of walking beam work and instructions concerning construction changes of cooler
|
2006 |
CELSA – STEEL PLANT OSTROWIEC |
- Electric arc furnace no 6; Q = 140 Mg |
- Building Permit Design for electric arc furnace - Strength analysis of hall structure of electric steelworks in order to mantle new exhausting hood and new exhausting ducts for electric arc furnace Q=140 Mg - Technical documentation of reinforcement electric arc furnace hall - Foundations under exhausting systems of furnace - Expansion of exhausting system (new dust silo) - Technical documentation of control room and electrical building of dedusting system - Technical documentation of transformer building 115 MVA electric arc furnace - Relocation of electric networks
|
2005 |
CMC ZAWIERCIE SA |
Electric arc furnace – Continuous Casting Line - Installation of self-cleaning HYDAC filter for CCM 1 and 2 water systems. - Waste water systems for the new requirements of CMC Zawiercie EAF + CCM department
|
Complex multidiscipline design works
|
2004 |
CMC ZAWIERCIE SA |
-Electric arc furnaces + Continuous Casting Machine dept.
|
- Technical modernization of two tundishes for Steel Continuous Casting Line - Strength analysis and technical documentation of reinforcement tundish roadbeds
|
2004 |
DANIELI & C.SPA ITALY UNICOIL SAUDI ARABIAN |
Cold Rolling Mill - quick work-roll change car - quick work-roll change tractor - rolling mill drive - main drive spindle
|
Detail Engineering of equipment
|
2004 |
CMC ZAWIERCIE SA |
Materials/products flow organization
|
Analyze of possibilities with technical conception
|
2004 |
ISPAT POLSKA |
- Overhaul of substation P50d/0,4 kV - Blow distributing station fo |
<